Drip edges have two key purposes.
Proper gutter drip edge attachment.
The correct placement of the drip edge is the top of the roof directly between the shingles and the fascia board.
They differ for their shapes and installation.
It should be a minimum extension of two inch from the fascia board on the roof.
Place the the back of the gutter into the hangers front side up.
Bryan texas roofers adhere to the city s municipal code that determines the proper attachment of drip edges and their supporting underlayment.
A drip edge is designed to take advantage of those forces and along with gravity direct water into the gutter.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Please ensure that the drip edge is extended over the gutter.
If this slight overhang is too short water will drip behind the gutters leading to rotted roof sheathing and fascia stained siding and even soil erosion and a flooded basement.
Due to cohesion surface tension and other forces water droplets tend to stick to one another and to the surfaces they are on albeit slightly.
Direct water away from fascia.
7 drill 3 16 inch holes into the.
This keeps your roof safe from rotting and leaking.
The lower edge of a roof should extend beyond the fascia board by about 3 4 inch so that runoff drains into the gutters.
Push down on the front of the gutter until the back edge of the gutter slides or snaps in.
You can be confused among these two metals flashings as they are completely identical and serve the same purpose.
A drip edge or a gutter apron keeps your roof secure by filtering out all the water from the attic into the gutter.
The drip edge should be installed over a furring strip so that it tails off the fascia board.