A set of sleepers supports the decking and allows moisture and air to flow below it.
Roof sleeper definition.
Mac users please click command f.
This is the standard gapping for duralife products air should be allowed free movement under the structure do not.
To search the glossary for a specific word or phrase hit the ctrl and f buttons on your keyboard simultaneously and enter the keyword you wish to search for.
Concealed roof gutter for a modern home los angeles home builder duration.
1 4 6 4 mm minimum gap where the decking meets a solid wall maximum of 3 8 9 5 mm recommended 3 16 4 8 mm gap between boards.
Your valley jacks will get nailed to them.
Sleeper system installation brochures pdf this installation method works well when joists are not 16 o c or if it s a new construction deck or a deck remodel where there aren t any height restrictions.
Roof top deck with sleeper system install guide.
Most basements have concrete floors which have the potential to draw moisture.
What are they exactly.
They are typically used to elevate piping ductwork hvac equipment walkways pv solar supports and more from rooftops.
Sleepers are placed between the deck surface and the ground or slab below it.
Each term is accompanied by a brief definition.
Fasten the sheet with 2 1 2 inch coated screws every 6 inches along the walls and every 8 inches across the sheet.
Fasten the sleepers through the shims with powder actuated fasteners.
Subfloor sleeper are used in basements to protect certain types of flooring such as laminate hardwood and carpet.
Deck must be designed to ensure that proper drainage and air flow are maintained.
Thanks in advance joe.
Rooftop sleeper standoff support.
The sleeper standoff support offers a strong and economical solution for creating an elevated rooftop standoff from existing sleeper supports or roof curb.
However because the subfloor may have dips or.
The building inspector wrote on the elevation plans that we need roof sleepers for our gable dormers.
I can t seem to find much about them online.
The sleeper joists follow the same arrangement and spacing as the main home joists located under the subfloor.
Decking laid directly over packed soil will rot quickly and wood laid over concrete rots as well when moisture is trapped between the two materials.
Joe those are the false valleys that will sit flat on the existing roof.
Resonne building and design 2 050 views.
Step 3 start underlayment set the first sheet of underlayment tongue to the wall with the long side perpendicular to the sleepers and 1 2 inch from the wall.
On the sleeper system installation method you lay 2x4s flat install them perpendicular the opposite way across the joists.